How to get a building permit in Accra, Ghana

A plain-language, step-by-step guide to the permit process in Greater Accra — which documents you need, which office to visit, how long it takes, and what it costs. Last updated June 2026.

Let Us Handle the Permits Read the Guide ↓
Step-by-Step Process

The building permit process, explained

Ghana's National Building Regulations (L.I. 1630) require a permit before any construction begins. Here is the full process, from preparation to approval.

1

Engage a licensed architect

The district assembly will not accept building drawings prepared by an unlicensed person. You need a Ghana Institution of Architects (GhIA) registered architect to prepare your architectural drawings. These must include floor plans, elevations, sections, and a site plan showing the building's position on the plot.

Tip: Cornerstone works with licensed architects and can manage this step as part of your full build package — you don't need to source one separately.
2

Obtain your site plan from the Lands Commission

A certified site plan is required to show the dimensions and boundaries of your plot. If you don't already have one, it is obtained from the Lands Commission, Accra (located at Cantonments). Processing typically takes 2–4 weeks and costs a prescribed fee based on plot size.

  • Application form from the Lands Commission
  • Copy of your Indenture or land title
  • Ghana Card or passport for ID
  • Plot number / GIS coordinates if available
Note: If your land is in a newly developed area without survey records, this step may take longer. Always confirm survey coverage before purchasing a plot.
3

Prepare your full document package

Before going to the assembly, have all of the following ready. Incomplete applications are a leading cause of delays.

  • Completed building permit application form (collected from your assembly)
  • Architectural drawings (4 sets, signed and stamped by your architect)
  • Certified site plan from the Lands Commission
  • Copy of your land title, Indenture, or lease agreement
  • Structural drawings (if your build is 2 storeys or more)
  • Electrical layout drawings (for most residential builds)
  • Copy of applicant's Ghana Card or passport
4

Submit to your district or metropolitan assembly

Applications are submitted to the Physical Planning Department of whichever assembly has jurisdiction over your plot. In Greater Accra, this is usually one of the following:

  • Accra Metropolitan Assembly (AMA) — for central Accra
  • Ayawaso West, East or Central Municipal Assembly
  • Adentan, Ga East, Ga West or Ga South Municipal Assembly
  • Tema Metropolitan Assembly — for Tema and surrounds
If unsure: Check which assembly your Electoral Area falls under — your plot's street address usually makes this clear, or ask at the nearest assembly office.
5

Site inspection by the assembly

After submission, the Physical Planning Department will send officers to inspect your site. They verify that the proposed building matches the drawings submitted and that the land use is consistent with zoning (residential, commercial, etc.). This inspection is what triggers the longest waiting period in most cases.

How to speed this up: Ensure the plot is clearly marked and accessible. If officers cannot locate or access the site, the inspection is postponed — adding weeks to your timeline.
6

Pay permit fees and collect your permit

Once approved, you will be notified to pay the prescribed permit fee. Fees are calculated based on gross floor area and use type. After payment, the permit is issued — collect the original and keep it on-site throughout construction, as inspectors may ask to see it.

Important: The permit specifies what was approved. If you deviate from approved drawings during construction, you may need to apply for an amendment — which restarts part of the process.
Typical Costs

What does a building permit cost in Accra?

Permit fees are set by each assembly and reviewed periodically. The figures below are approximate ranges based on June 2026 rates — confirm the current fee schedule with your specific assembly before budgeting.

Building Type Floor Area Approximate Permit Fee Typical Total Time
1–2 Bedroom Bungalow 40–60 m² GHS 800 – 1,200 6–10 weeks
3 Bedroom Bungalow 80–120 m² GHS 1,200 – 1,800 6–12 weeks
4–5 Bedroom House 140–200 m² GHS 1,800 – 2,800 8–14 weeks
Small Commercial Building Up to 300 m² GHS 3,000 – 6,000 10–16 weeks
Multi-storey / Apartment Block 300 m²+ Assessed individually 12–20 weeks

* Fees do not include architect fees, structural engineer fees, or Lands Commission site plan costs. Budget separately for those.

What delays most permit applications

Most permit delays are caused by the same avoidable issues. Knowing them in advance can cut weeks off your wait.

  • Drawings not stamped by a licensed architect — rejected on submission
  • Site plan missing or not from the Lands Commission — incomplete file
  • Indenture not registered — land ownership cannot be confirmed
  • Plot not accessible for inspection — inspection postponed indefinitely
  • Wrong assembly — submitting to AMA for a plot that falls under Adentan Municipal
  • Starting construction before permit is issued — stop-work order risk

How Cornerstone handles permits for you

  • We confirm your plot's assembly jurisdiction before starting
  • We coordinate with our licensed architects for drawings
  • We prepare and submit the full document package
  • We liaise with the Physical Planning Department on your behalf
  • We track the application and follow up on the inspection date
  • We collect the permit and keep a copy on-site throughout the build
Let Us Handle This →
Frequently Asked Questions

Permit questions, answered

Do I need a building permit to build a house in Accra?

Yes. Under the Local Governance Act 2016 (Act 936) and the National Building Regulations, all new construction in Ghana requires a permit from the relevant district or metropolitan assembly before work begins. Building without a permit exposes you to demolition orders and fines.

How long does a building permit take in Accra?

Officially the Accra Metropolitan Assembly targets a 20-working-day turnaround. In practice most applicants experience 6–12 weeks, depending on document completeness and the backlog at the physical planning department. Permits in peri-urban areas (Kasoa, outer Adentan, Ashaiman) may take longer due to assembly capacity.

Can I start building while the permit is being processed?

No. Starting construction before your permit is issued is a violation of the National Building Regulations. If inspectors observe unauthorized work, a stop-work order can be issued — and in serious cases, the assembly can order demolition at the owner's expense. The permit must be in hand before the first shovel goes in the ground.

What happens if I build without a permit in Ghana?

The district assembly can issue a stop-work order, require demolition of the unauthorized structure, and impose fines. An unpermitted structure also creates problems at resale and may prevent you from accessing electricity and water connections from utilities.

Do I need a separate permit for renovation or extension work?

Generally yes, if the work involves structural changes, increases the footprint of the building, or alters the approved drawings. Minor internal renovations (repainting, tiling, fitting replacement) typically don't require a permit. If in doubt, check with your local assembly's physical planning department before starting.

Can Cornerstone obtain the permit on my behalf?

Yes. We handle permit applications as part of our full construction service. We coordinate with the architects, prepare the document package, submit it to the correct assembly, and track the application through to approval. Most clients find this significantly less stressful than doing it independently. Get a quote here.